Installation connection of work device
Correctly connect the vibration leveling part of the laser screed with the fuselage motive part, fasten connecting bolts, installation the B type split pin. As picture 4.1.
Working device installation and connection step:
l Place the work device on a horizontal floor, move the body parts to the right place.
l Connect the two ends of the connecting frame respectively with the working device and the body; fasten connecting bolts, installation the split pin.
l Connect the electric push rod and the ends of the two connecting rods with the working device and the body; fasten connecting bolts, installation the split pin.
l Adjust link rod to working device and body, make sure they are basically in horizontal state.
l retract rear wheel support
l Transfer the installed equipment to the construction site.